115 KV Substation Bay Addition

115 KV Substation Bay Addition

Owner : Provincial Electrical Authority of Thailand
Location :Bung, Banglane, Nongpling, Thailand
Scope of Work : Building control.
Installation of electrical distribution systems.
The installation of high voltage 115 KV.

About Us

Power Line Engineering Public Co., Ltd

was established on July 8th, 1988 by a group of engineers led by Mr. Swake Srisuchart and Mr. Amnuay Kanjanopas, to engage in the services of the design...Read More

Contact us

Power Line Engineering Public Co., Ltd

  • 2 Soi Sukhumvit 81 (Siripoj) Sukhumvit Rd.,
  • Bangjak, Phrakhanong Bangkok 10260
  • Tel: 66-2332-0345 Fax: 66-2311-0851
  • Email: pirunporn@ple.co.th
2214682
Today
Yesterday
This Week
Last Week
This Month
Last Month
All days
641
1322
7508
2199423
19774
47246
2214682
Your IP: 3.238.250.105
17-04-2021 08:44

Map